For Dairy - Terms & Conditions


Offer Eligibility
  1. To be eligible for the For Dairy plan ("Plan"):
    1. You must be an existing or a new to Genesis business customer whose primary business purpose is Dairy Farming in New Zealand;
    2. You must have an eligible meter installed at your premises;
    3. Genesis must receive acceptance of your Genesis Quote Summary (“Quote”) within the applicable timeframe as stated in your Quote (or any applicable timeframe as agreed by Genesis).
  2. The term of the Plan is 24 months (“Term”) and includes during the Term:
    1. Differing Genesis energy rates based on “peak”, “off-peak” and “shoulder” periods over a 24-hour period. These rates differ between weekdays and weekends and between summer and winter periods which are set out in the quote supplied to you.
    2. Your pricing is made up of:
      1. a Genesis component. This is set out under the “Genesis Pricing” section of your Quote and will be fixed for the Term of your plan;
      2. A separate network component. The current network charges are set out under the “Network Charges” section of the price sheet provided to you at sign up and can be found here and is made up of all applicable network/distribution charges, levies and lines losses that will be passed through to you at cost where practical. Where it is not practical, Genesis shall apply an estimate of that applicable charge to your bill based on data available for your connection. The network component of your pricing is subject to change during the term of your plan.
Eligibility, Exclusions, Termination and Expiry
General