Rivers, Lakes and Rainfall

Genesis Energy collects detailed rainfall, river flow and lake level data from around our hydro generation sites. To view the hydrology website click here.


Environmental News

Genesis Energy is keen to keep you informed of upcoming events and recent milestones. Events or milestones will be listed here as they arise.


Consultative meetings

A number of meetings are held at our sites during the course of a year, from annual consultative meetings to more detailed meetings relating to specific issues. Dates of upcoming consultative group meetings will be listed here.


Press releases

From time to time Genesis Energy provides press releases relating to our power schemes and environmental initiatives.


Recreational Release Dates

Genesis Energy is required to release recreational flows on the Tongariro River, Whakapapa River and Waikaretaheke River as part of the resource consents to operate the Tongariro Power Scheme and Waikaremoana Power Scheme. The dates are set in conjunction with the New Zealand Recreational Canoeing Association.

River flows can vary quickly and it is a good idea to check the weather forecast and assess flow conditions on the river before heading out. Flow data is available from the Hydrology website or on the Genesis Energy flow phone 073868113


Waikaretaheke River

  • Saturday 9 January 2010 - Release below Whakamarino Dam and Piripaua Power Station
  • Sunday 10 January 2010 - Release below Whakamarino Dam and Piripaua Power Station
  • Sunday 28 February 2010 - Release downstream Piripaua Power Station
  • Saturday 27 March 2010 - No flow downstream Piripaua Power Station
  • Sunday 28 March 2010 - Release downstream Piripaua Power Station
  • Saturday 1 May 2010 - No flow downstream Piripaua Power Station
  • Sunday 2 May 2010 - Release downstream Piripaua Power Station
  • Sunday 22 August 2010 - Release downstream Piripaua Power Station
  • Saturday 9 October 2010 - No flow downstream Piripaua Power Station
  • Sunday 10 October 2010 - Release downstream Piripaua Power Station
  • Saturday 6 November 2010 - Release below Whakamarino Dam and Piripaua Power Station
  • Sunday 7 November 2010 - Release below Whakamarino Dam and Piripaua Power Station
  • Sunday 12 December 2010 - Release downstream Piripaua Power Station

Tongariro Power Scheme Recreational Release Dates

  • Sunday 10 January 2010 - Release downstream Rangipo Dam
  • Saturday 6 February 2010 - Release downstream Poutu Intake
  • Sunday 7 February 2010 - Release downstream Rangipo Dam
  • Saturday 18 September 2010 - Release downstream Poutu Intake
  • Sunday 19 September 2010 - Release downstream Rangipo Dam

Whakapapa River

  • Saturday 4 September 2010 - Release downstream Whakapapa intake
  • Saturday 25 September 2010 - Release downstream Whakapapa intake

Moawhango flushing flows

These are not suitable for recreational use
*Note that the Moawhango River flows into the Rangitikei River which will also be affected by these flushing flows.

  • Wednesday 9th December 2009 - Release downstream of Moawhango Dam
  • Wednesday 27th January 2010 - Release downstream of Moawhango Dam
  • Wednesday 24th February 2010 - Release downstream of Moawhango Dam
  • Wednesday 24th March 2010 - Release downstream of Moawhango Dam
 


« Powered by Straker SHADO CMS »